Traffic Management

Units of competency:  RIIOHS302A Implement traffic management plan  tm

Delivery period:                               1 Day

Target Groups:  

  • General Construction Workers
  • Civil Construction Workers
  • Site Supervisor  

Plan and prepare:   

  • Traffic guidance scheme is selected to suit site conditions, traffic volumes and work activities
  • Work instructions, including plans, specifications, quality requirements and operational details relevant to the tasks are obtained, confirmed and applied to the allotted task
  • Safety requirements are obtained from the site safety plan and organisational policies and procedures, confirmed and applied to the allotted task
  • Signage requirements are identified and obtained from the project traffic management plan and implemented
  • Tools and equipment selected to carry out tasks that are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported Environmental protection requirements are identified from the project environmental management plan confirmed and applied to the allotted task

 Set out the traffic: 

  • Work schedule, maximum traffic delays, signals and site communications are determined and adhered to
  • Signs and devices are correctly positioned on the approaches to the work area in accordance with the traffic management plan
  • Signs and devices are positioned and displayed on each approach according to State or Territory Road Authority requirements and the traffic management plan
  • Traffic is controlled effectively to protect the work crew placing traffic control devices around the work area  

 Monitor traffic

  • Traffic flow is monitored and effectiveness of guidance scheme determined
  • Work activities are monitored and guidance scheme adjusted

  Close down traffic: 

  • Traffic is controlled to protect work crew removing traffic control devices from the work area
  • Signs are removed in sequence to provide maximum warning during removal of traffic control devices
  • Incidents are reported as required by the organisation and/or State or Territory Road Authority 

  Practical Demonstrations Include:

  • Sign Placement
  • Vehicle Simulated Activities
  • Worksite Risk Assessments

 Assessment Methods: 

  • The application of competency is to be assessed in the workplace and realistically simulated worksites.
  • Assessment method will be via written and practical demonstration at varied intervals during the course.nrt

Cost: $200.00 per person + $65.00 Photo ID Certificate

* When combining traffic control with traffic management only one $65.00 card fee is applicable 